Ridgeview Park & Rangeview Gulch

  • Project typeStorm Drainage
  • Project statusConstruction
  • StartSummer 2026 (interim work)
  • CompletionFall 2026 (interim work)
Ridgeview Park pond

Ridgeview Park Pond - July 2026. See supporting documents for project plans.

The City of Littleton’s Integrated Water Resources Plan recommended four alternatives for the existing retention pond at Ridgeview Park. This is the vision for the future redevelopment of the park.

In the meantime, the city is working on an interim solution for the Ridgeview Park Pond based on updated hydraulic modeling for Rangeview Gulch. The city will reshape the pond and create a floodplain channel similar to the other section of channel in the park. This will help mitigate the odor and improve water quality.

Public Works plans to use excess fill from the Broadway at Lee Gulch culvert repair and underpass project to de-muck and raise the bottom of Ridgeview Park Pond, providing significant savings to both projects. To further help the area drain, Public Works will replace the outlet pipe to the park inlet to ensure it is properly sized and matches the storm sewer in Curtice Street. These changes do not alter the floodplain mapping for the area. Revegetation will mostly match adjacent channel and park landscapes. 

The city aims to begin work in summer 2026 and is working through the permitting process for this project and final design.

The Mile High Flood District (MHFD) will manage the project on the city’s behalf. This interim solution is a part a larger project along Rangeview Gulch. The interim solution is being designed to fit into the Ridgeview Park redesign project, with minimal modifications needed. 

Visit the South Suburban Parks & Recreation Ridgeview Park Redevelopment page for more background and information.

Supporting documents:

Frequently Asked Questions

Why is the city making changes to Ridgeview Park?

The Ridgeview Park and Rangeview Gulch project is part of the City of Littleton's long-term effort to improve stormwater management, increase flood resilience, improve drainage, and enhance water quality while maintaining the park as a valued community space.

The project supports implementation of the city's 2023 Integrated Water Resources Plan and includes evaluation of the Rangeview Gulch corridor from Prince Street to its outfall at the South Platte River.

Why are changes being made to the pond?

The existing pond has been a familiar feature of the park for many years. However, the High Line Canal no longer provides water to the pond, and modifications are needed to meet current stormwater management goals identified in the Integrated Water Resources Plan.

The project is intended to improve drainage, reduce stagnant water conditions, improve water quality, and provide long-term flood protection.

Is this project only because of odor complaints?

No. While some residents have reported unpleasant odors during periods of low water or standing water, others have shared that they have not experienced odors.

The project is not based on any single concern. It is intended to address multiple long-term objectives, including:

  • Improving stormwater management
  • Increasing flood resilience
  • Improving drainage
  • Enhancing water quality

Will the park be preserved?

Yes. The city recognizes Ridgeview Park as an important community asset and is working to balance necessary infrastructure improvements with preserving the park as a valued public space.

The city in coordination with South Suburban Parks and Recreation District (SSPRD) are still working on the larger park design plans. This interim plan limits construction to the existing pond footprint.

Are trees being removed?

No trees are being removed as part of the summer/fall 2026 interim work. Existing trees and landscaping are important components of the park. Future vegetation decisions will be evaluated as design progresses.

What vegetation is being removed?

Vegetation (weeds) located within the existing pond area is being removed as part of the summer/fall 2026 interim work.

What improvements are planned for Rangeview Gulch?

The project includes evaluation of the Rangeview Gulch corridor from Prince Street to its outfall at the South Platte River as part of the overall stormwater system. The goal is to improve drainage, stormwater movement, and flood resilience throughout the corridor.

Why is work happening now?

Completing the interim work in summer/fall 2026 allows the city to repurpose imported soil from the nearby Broadway at Lee Gulch project, resulting in more than $300,000 in savings for the city.

What is the current project schedule?

Construction of the interim work began in summer 2026 and may be adjusted depending on weather conditions. Completion of the interim work is anticipated in fall 2026. The city will continue to share updates on design and construction timelines as they become available.

Why were crews conducting soil drilling?

Geotechnical (core) sampling is a standard part of the engineering design process. It provides engineers with important information about soil conditions that helps inform the final design.

What about irrigation, tree health, and park maintenance?

The city appreciates residents' feedback regarding irrigation, mature trees, and overall park maintenance.

These comments are being shared with the appropriate staff as planning continues. Protecting valuable park resources remains an important consideration while also managing water restrictions during periods of drought.

Has the city considered a different product other than rip rap to line the channel?

This will be a soil-filled rip rap channel. Other alternatives including a concrete channel have been considered. The swale will be monitored during the larger Rangeview Gulch project to determine if the channel bottom needs to be modified. 

What will happen if the immediate Ridgeview Park area receives a measurable rain/snow prior to project completion?

The interim project is designed to still receive runoff and rainfall during construction.

What is the cost and schedule for the entire project?

Interim project construction is estimated to be completed fall 2026. Vegetation establishment and monitoring will continue for up to two years after construction. Construction costs are estimated to be $500,000.

Will there be opportunities for public input?

The overall park project still remains in design. The City of Littleton and South Suburban Parks and Recreation will continue to provide park project updates and opportunities for residents to share feedback as planning and design move forward.

If the pond is filled in, are there any flooding risks?

Ridgeview Pond was not designed to detain stormwater. The pond modifications are intended to reflect the same conditions as current conditions. The outfall pipe will also be modified to allow for additional drainage. The larger project will also consider additional downstream storm sewer enlargement.

Where can I learn more?

For the latest project information, visit:

City of Littleton

South Suburban Parks and Recreation