Prince Street Resurfacing

  • Project typePavement Management
  • Project statusDesign
  • StartFall 2026
  • CompletionSpring 2027
Prince Street
Prince Street and Lee Gulch - 2025

The City of Littleton and consultants are beginning design work for the 2027 resurfacing project on Prince Street. This project will improve pavement conditions, enhance safety for people walking and biking, and update striping and layout to align with Safer Streets Littleton and the Transportation Master Plan. Resurfacing is a roadway maintenance process where the top layer of old asphalt is replaced with a new surface. 

Project Boundaries 

The project runs along Prince Street: 

  • From the top of Jackass Hill at the High Line Canal Trail pedestrian crossing
  • To the northern city boundary, north of Belleview Avenue
  • There will be a gap in the project from the Prince Street and Church Avenue intersection, north to Santa Fe Drive Frontage Road, since this section is concrete pavement or under consideration for future projects.

Project Purpose 

An engineering consultant is working with the city to assess pavement conditions and design improvements that best fit the corridor. Their work includes the following improvements and enhancements:

Pavement Improvements

  • Determining whether a traditional mill and overlay or a hot in-place recycling method is most appropriate 
  • Verifying pavement thickness and structure 
  • Designing pavement and striping plans that follow standards and safety programs 

Traffic and Safety Enhancements  

To better understand how the corridor is used, the consultant will collect traffic and parking data, including: 

  • 12‑hour turning movement counts at three key intersections 
  • Parking utilization counts between Ridge Road and Lake Avenue 

They will also design quick-build (temporary but durable) safety improvements, such as: 

  • Traffic calming features
  • Bike lane upgrades
  • Protected intersection designs where applicable 

The improvements outlined above have the potential of affecting on-street parking options on certain stretches of Prince Street. 

Tree Pruning and Property Owner Responsibilities

Do you own trees along Prince Street? Before resurfacing begins, check that tree branches are at least 10 feet high over sidewalks and at least 14 feet high over the roadway, as required by city code. 

Property owners are responsible for trees in the public right-of-way adjacent to their property. Maintaining proper clearance helps prevent tree damage from construction equipment and other vehicles accessing the roadway during resurfacing. 

Watch for a notice letter from the city, if a tree is found to be in violation of required clearance standards. The city may request pruning before construction begins. Proactive pruning helps protect your trees and keeps sidewalks and roadways safe and accessible during construction. 

Stay Informed

Residents can stay informed about the project design through the Littleton Report, Littleton Links, and social media. Direct coordination with adjacent project stakeholders will also be part of the process. 

Design Timeline & Coordination 

After design is complete around spring 2027, the consultant will continue to support the project by answering engineering questions during the construction phase. Construction is expected to begin sometime in 2027, following completion of design and community engagement. 

Why This Project Matters

Prince Street is an important connector for people walking, biking, driving, and accessing nearby neighborhoods, schools, and parks. This project will: 

  • Extend the life of the roadway
  • Improve comfort and safety for all users 
  • Support the city’s long-term vision for safer, more connected streets