Belleview Avenue and Federal Boulevard Storm Sewer Repair

  • Project typeStorm Sewer Repair
  • Project statusUnder Construction
  • StartJune 2025
  • CompletionLate Summer 2025

Project Overview

The City of Littleton is prioritizing vital repairs and replacements to the city’s stormwater system, including several major culvert replacements. This follows a citywide evaluation of stormwater infrastructure showing that some of the system’s components are at the end of their usable life. In order to ensure public safety and prevent larger issues, some components must be replaced as soon as possible. Newly-replaced stormwater infrastructure is more durable, helping Littleton be well-positioned for the future.

This storm sewer repair project will begin June 2025 to replace a failing storm sewer that runs under the intersection of Belleview Ave and Federal Blvd.

The project includes:

  • Removal of approximately 182 linear feet of 38”x57” arch corrugated metal pipe (CMP) and replace with 36” reinforced concrete pipe (RCP).
  • Replacement of 1 concrete junction box and modifications to 2 existing concrete junction boxes
  • Approximately 257 linear feet of cured-in-place pipe lining

Schedule Highlights

This project is estimate to take 10 weeks to complete.

Traffic Impacts

Due to the nature of this project, full roadway excavation is required. Federal Blvd south of Belleview Ave will be fully closed. Detour routes will be marked, including local access to Partner Colorado Credit Union and Foushee SalonSpa.

Contact Information

Project Manager 
Antonio Muniz 
Water Resources Project Manager
amuniz@littletonco.gov  
303-795-4034

Deputy Project Manager
Sarah White
Water Resources Manager
swhite@littletonco.gov
303-795-3826